ForAcademicPurposes
Member
Last edited:
UPDATE: On Oct 29, 2019, the bridge was raised by 8 inches to match the grade of the Duke St. level crossing. This change improves the overall grade of the track and may improve traffic safety due to the additional clearance over the road. The engineers at the site explained that raising the grade any further is not feasible, because that would introduce a ” hump” at the Duke St. level crossing, which would introduce a risk of vehicles with low road clearance bottoming out at that crossing.